Drivers in Allegheny County can now take the Mon/Fayette Expressway from the Route 51 interchange in Jefferson Hills to Camp Hollow Road in West Mifflin. The Pennsylvania Turnpike Commission set Nov. 20 as the opening day and now lists both construction sections as open to traffic. On the toll map, the new northern interchange is Exit 57, labeled West Mifflin/Clairton. Opening advisory · Project status · Toll map
The toll tables list both Exit 54 at Route 51 and Exit 57 at Camp Hollow Road without a ramp charge. The charge for traveling between them is collected on the expressway itself, at the overhead gantry at milepost 55. Both directions are charged. For a two-axle vehicle, the rate is $0.97 with E-ZPass and $1.94 with Toll By Plate. Turnpike 43 rate tables, pages 63 and 121
A driver who goes from Route 51 to Camp Hollow Road and returns the same way would pay $1.94 with E-ZPass or $3.88 with Toll By Plate for those two crossings. The commission says the new gantry rates were set using 2027 prices and will stay the same in January. Rate tables · Commission advisory
Camp Hollow Road is the end of the expressway for now. The commission lists the next section, toward Pittsburgh McKeesport Boulevard in Dravosburg, with an expected opening in October 2029. The Pittsburgh Post-Gazette reported Thursday that the Dravosburg section was already under construction. The longer connection to I-376 in Monroeville remains a future phase. Construction phases · Pittsburgh Post-Gazette reporting
Cover photograph by Mr. Matté, Wikimedia Commons, CC BY-SA 4.0. The archive image shows the Uniontown toll approach. The site may crop the image in previews.